Traditional Remodel/Addition- #2of SeriesHank discusses front retaining wall, the foundation of the new master suite and how it ties into the existing house foundation, waterproofing, footings for the existing screened porch. Elevation of the pool is set and pool is formed up. Dirt hauling. Backfilling the basement slab. |
| Date | Title | Speaker | Watch |
| 10/25/2010 | Traditional Remodel/Room Addition #6 | The Moody Blues | Watch Video |
| 10/25/2010 | Traditional Remodel-Room Addition #5 | Hank Sullivan | Watch Video |
| 10/25/2010 | Traditional Remodel/Room Addition #4 | Hank Sullivan | Watch Video |
| 02/11/2010 | Traditional Remodel/Addition #3 | Hank Sullivan | Watch Video |
| 01/24/2010 | Traditional Remodel/Addition- #2of Series | Hank and Larry | Watch Video |
| 01/12/2010 | Traditional Remodel/Addition- #1 of Series | Hank Sullivan and Larry Forbes | Watch Video |