Traditional Remodel/Addition #3The retaining wall is complete. Master bedroom foundation is complete. Crew install beams as 'brick sandwich" to hold up brick, begin framing master bedroom suite. Garage Slab is formed and inspected, ready to pour. |
| Date | Title | Speaker | Watch |
| 10/25/2010 | Traditional Remodel/Room Addition #6 | The Moody Blues | Watch Video |
| 10/25/2010 | Traditional Remodel-Room Addition #5 | Hank Sullivan | Watch Video |
| 10/25/2010 | Traditional Remodel/Room Addition #4 | Hank Sullivan | Watch Video |
| 02/11/2010 | Traditional Remodel/Addition #3 | Hank Sullivan | Watch Video |
| 01/24/2010 | Traditional Remodel/Addition- #2of Series | Hank and Larry | Watch Video |
| 01/12/2010 | Traditional Remodel/Addition- #1 of Series | Hank Sullivan and Larry Forbes | Watch Video |